What Is in a Site Work Quote, Line by Line
Two quotes for the same lot can be $10,000 apart and both be honest. The difference is nearly always what each one leaves out. Here is what should be on the page.
Updated November 2026 · Georgian Bay Siteworks, the site work division of ICFHome.ca
The lines a good quote has
| Line | What it covers | What to ask |
|---|---|---|
| Machine work | Excavator, skid steer or mulcher with operator | Fixed price or hourly? If hourly, is there a minimum? |
| Float | Hauling the machine to your lot and back. Roughly $500 to $1,000. | Is it included, and is it charged once or per visit? |
| Trucking | Hauling soil, stumps or brush away, and bringing gravel, sand or topsoil in | How many loads is the price based on? |
| Materials | Gravel, sand, pipe, culverts, the septic tank, topsoil, sod | What depth and what grade of material? |
| Permits and fees | Septic, entrance and conservation permits | Who applies, and who pays the fee? |
| Restoration | Final grade, topsoil, seed or sod | Is it included, or does the site get left rough? |
Float range from our driveway calculator. Machine rates are in the excavation cost guide.
The extras that blow budgets
- Rock. Nobody can see it until the bucket hits it. A good quote says what happens and what it costs if we do. See building on rock or wet lots.
- Water. A hole that fills needs pumping and slows everything down.
- Trucking. On a lot of jobs, moving the dirt costs more than digging it. The fill and excess soil rules decide where it can go.
- Stumps. Ground down or dug out are two different prices. See the stump guide.
- HST. Check whether the number includes it.
Fixed price or hourly?
Fixed price suits a defined job, like a basement with a known footprint. Hourly suits work nobody can measure ahead of time. Either is fair if it is written down. The excavation cost guide compares the two.
Comparing two quotes
- Line them up item by item. If one has no trucking line, that is not a saving. It is a surprise.
- Check the depths and quantities: inches of gravel, loads of fill, number of stumps.
- Check who gets the permits and the locates.
- Ask each contractor for an insurance certificate and a WSIB clearance. Our hiring guide shows how.
Ours comes in writing, line by line, after we have seen the lot. How we work covers the rest.
Frequently Asked Questions
Why do site work quotes vary so much?
Usually because they do not cover the same scope. One includes stump removal, trucking and restoration and the other does not. Compare them line by line.
What is a float charge?
The cost of hauling the excavator to your lot and back on a float trailer, roughly $500 to $1,000.
Should I take the lowest quote?
Only if it covers the same work. A low quote that leaves out trucking, rock or restoration is usually the expensive one by the end.
More about working with us
Did Not Find Your Question?
Call 705-533-1633 or send us the address and what you are planning. We answer the phone, and we give prices in writing.
Rather we call you?
Leave your name, number and town. We call back weekdays and give you a price in writing. Privacy policy.