How we workWritten pricesOne crew

How We Work: From Your First Call to the Last Load

Most complaints about contractors come down to four things: nobody called back, the price was a guess, nobody said when, and the bill had surprises. Here is how we handle each one.

Updated November 2026 · Georgian Bay Siteworks, the site work division of ICFHome.ca

Insured to $2,000,000Site work division of ICFHome.caBuilding since 1979250+ projects in Simcoe County

1. You call or send the address

Call 705-533-1633 or use the quote form. We answer the phone and we call back on weekdays. The office runs Monday to Friday, 8 to 5, and we meet on weekends by appointment for people who cannot get here during the week.

2. We walk the lot

A price given sight-unseen tends to grow once the machines arrive. So we look first: access, trees, slope, where the water goes, where the septic can go, and which permits apply. If you are still deciding whether to buy, the buildable lot scorecard is a good place to start.

3. You get a written quote

Line by line, with what is included and what is not, and a realistic timeline. See what is in a site work quote for a plain walk through one.

4. We book the work

When we can start depends on the season and the permits. Fall and early winter book up fast, and so does every other crew around here. Spring brings half-load season, which limits heavy trucks. The rule of thumb: get permits moving in winter, and call us before you need us, not the week you need us. The best time of year guide lays out the calendar.

5. One crew does the job

Clearing, excavation, septic, driveway and grading are done by the same crew with our own machines, so nobody is waiting on another trade to show up. We get the utility locates before we dig. Every time.

Our Kobelco excavator clearing brush and debris on a waterfront lot
Our Kobelco excavator clearing brush and debris on a waterfront lot.

6. Payment

The payment terms are written into the quote before we start, so there is nothing to argue about later. As a guide to what is normal in Ontario: a modest deposit to hold the dates, progress payments as stages are finished, and a 10% holdback under the Construction Act. Our guide to hiring a site contractor explains deposits, holdbacks, insurance certificates and WSIB clearances, and it applies to us as much as anybody.

7. What we stand behind, and what we do not

We are insured to $2,000,000 and WSIB covered. Two things we say up front: sod is not warranted, because whether it lives is up to the hose and not the shovel, and damage from bad weather and natural disasters is not covered. The full terms are on how we price and our guarantee.

Frequently Asked Questions

How soon can you start?

It depends on the season and on permits. Fall and early winter fill up first. Call early, and we will give you a realistic date with the written quote.

Do you charge for a quote?

You get a written price based on what is actually on your land. Call us and we will tell you how the site walk works for your lot.

Can we meet on a weekend?

Yes, by appointment. The office is open Monday to Friday, 8 to 5.

Did Not Find Your Question?

Call 705-533-1633 or send us the address and what you are planning. We answer the phone, and we give prices in writing.

Rather we call you?

Leave your name, number and town. We call back weekdays and give you a price in writing. Privacy policy.

Quick Quote (guide pages)