Category Permits

New home on a cleared and graded lot in spring, before final landscaping

Development Charges in Simcoe County

Development chargesPaid at building permitSimcoe County Development Charges in Simcoe County: The Bill Nobody Mentions You budgeted for the lot, the septic, the well and the house. Then the building department hands you a bill for development charges, and it…

Waterfront lot after clearing, before grading, with our excavator and tractor working near the shore

Shore Road Allowances Explained

Shore road allowanceWaterfront lotsTiny and Georgian Bay Shore Road Allowances: The Strip You May Not Own You bought a waterfront lot. You may not own the waterfront. On a lot of older surveys, a strip along the shore was set…

Excavator and dump truck preparing a building site in Simcoe County

Tiny Township Septic Re-Inspection: What You Have to Do

Septic Re-Inspection2026Tiny Township Tiny Township Septic Re-Inspection: What You Have to Do Tiny’s mandatory re-inspection program checks a different area each year on a roughly six-year cycle: Tatham Engineering does a visual surface inspection, and you arrange and pay a…

Excavator and dump truck preparing a building site in Simcoe County

Septic Permits by Town: Who Issues, Fees and Timelines (2026)

Septic Permits2026Tiny, Tay, Midland, Penetang, Wasaga, Collingwood, Oro-Medonte, Springwater Septic Permits by Town: Who Issues, Fees and Timelines (2026) In south Georgian Bay your septic permit comes from the local municipality (in Tiny, through its approval agent Tatham Engineering), fees…