The site work division of ICFHome.ca · Building since 1979 · Insured to $2,000,000 · 705-533-1633
Finishing a New-Build Lot: Grade, Topsoil, Sod

New Build Finish2026Tiny, Tay, Midland, Wasaga, Collingwood Finishing a New-Build Lot: Grade, Topsoil, Sod After the house is closed in, the lot gets finished in this order: final grade sloping away from the house, the lot grading certificate, at least…

