Soil and geotechnical reportsBefore you digOntario

Do I Need a Soil Test or Geotechnical Report Before I Build?

Most houses in Ontario get built without a geotechnical report. Some should not be. The trouble is finding out which kind of lot you have after the hole is open and the concrete is booked.

Updated November 2026 · Georgian Bay Siteworks, the site work division of ICFHome.ca

Insured to $2,000,000Site work division of ICFHome.caBuilding since 1979250+ projects in Simcoe County
Quick answer: on undisturbed sand or gravel, a typical house usually goes ahead on the soil the inspector sees in the open excavation. Expect to be asked for a soils report from an engineer when the lot has fill, organic soil or peat, soft clay, a high water table or a steep slope, or when the design needs more bearing than the ground obviously offers.

When to expect one

ConditionWhy it matters
Fill on the lotNobody knows how it was placed. Footings cannot sit on loose fill.
Organic soil, peat or muckIt compresses and rots. It has to come out or be bridged.
Soft or wet clayLow bearing and slow to drain
High water tableAffects footings, the basement and the septic
Steep slopeStability, and the walls that hold it
Rock close to surfaceGood bearing, but it changes the dig and the cost

Related: building on rock or wet lots and building on a steep lot.

Close-up of footing forms and rebar in a foundation excavation
Close-up of footing forms and rebar in a foundation excavation.

Three different tests people mix up

  • Septic soil evaluation. Test pits for the septic designer. About $500 to $1,500. See septic soil test cost.
  • Geotechnical report. A soils engineer’s report on bearing capacity and groundwater for the foundation.
  • Excess soil testing. Checks on soil leaving the site. See fill and excess soil rules.

What the inspector looks for in the hole

  • Footings on undisturbed soil, not on fill or topsoil.
  • No water standing in the excavation.
  • Depth: plan on 1.2 m below finished grade in Simcoe County. See footing depth and frost.
  • If anything looks soft, wet or made-up, the inspector can ask for an engineer before concrete is poured.

The cheap way to find out early

A test hole with our excavator, dug where the house will sit, shows you the soil layers and the water level. If it shows fill, muck or water, you call the engineer before the plans are final instead of after the hole is open.

Frequently Asked Questions

Is a geotechnical report required in Ontario?

Not for every house. The building department asks for one when soil, water, fill or slope raise a question about bearing or stability.

Who does a geotechnical report?

A geotechnical engineer. We dig the test holes. The engineer reads them.

Is a septic soil test the same thing?

No. The septic test looks at how the soil drains. A geotechnical report looks at how much weight it carries.

Did Not Find Your Question?

Call 705-533-1633 or send us the address and what you are planning. We answer the phone, and we give prices in writing.

Rather we call you?

Leave your name, number and town. We call back weekdays and give you a price in writing. Privacy policy.

Quick Quote (guide pages)