Hydro to a vacant lotPoles, trench and serviceOntario 2026

What It Costs to Bring Hydro to a Rural Lot in Ontario

Hydro is the line on a vacant-lot budget that swings the most. A lot with a pole at the road and a short run to the house is cheap to connect. A lot at the end of a long lane is not.

Updated November 2026 · Georgian Bay Siteworks, the site work division of ICFHome.ca

Insured to $2,000,000Site work division of ICFHome.caBuilding since 1979250+ projects in Simcoe County
Quick answer: on a short run from an existing line, the connection can cost close to nothing beyond your own service and trench. If poles are needed on your property, the run is long, or the line itself has to be extended to reach you, it can reach five figures. Trenching for an underground service runs about $15 to $40 a foot in normal soil (2026).

Who pays for what

PartWho pays
A basic connection from an existing lineThe utility covers a standard short connection
Extra wire beyond thatYou
Poles on your propertyYou
Going underground instead of overheadYou
Extending the line along the road to reach your lotYou may owe a capital contribution and an expansion deposit after the utility runs its numbers
The meter base, panel and wiringYou, through your electrician

From our vacant lot costs guide. Ask the utility for a written layout and estimate before you buy the lot. It is free to ask and it is the only number that counts.

Overhead or underground?

  • Overhead is cheaper on a long run, but it needs a cleared corridor and poles.
  • Underground looks better and keeps trees, and you pay for the trench, conduit and cable. Figure $15 to $40 a foot for the trench in normal soil, more in rock.
  • Either way, the route has to stay clear of the septic bed and the well line.
Gravel driveway winding through trees with armour stone edging
Gravel driveway winding through trees with armour stone edging.

Where site work comes in

  • Clearing the corridor for overhead lines, or the trench line for underground. See lot clearing.
  • Trenching to the depth and bedding the utility and the electrical inspector require. See trenching.
  • One trench, several services. Hydro, water and communications can often share a route if they are planned together. Dig once.
  • Locates first. See Ontario One Call.

Temporary power while you build

You will want power before the house is finished. A temporary service on a post is the usual answer. If you are thinking of a trailer on the lot, read living on your lot while building first, because most zoning does not allow it.

Frequently Asked Questions

How much does it cost to get hydro to a vacant lot?

Anywhere from very little on a short run to five figures when poles or a line extension are needed. Get the utility’s written estimate before you buy.

Is underground hydro worth it?

On a short run, often. On a long lane the trench and cable add up quickly.

How deep is a hydro trench?

It depends on the cable, the conduit and what the inspector requires. We dig to the depth on the approved layout.

Did Not Find Your Question?

Call 705-533-1633 or send us the address and what you are planning. We answer the phone, and we give prices in writing.

Rather we call you?

Leave your name, number and town. We call back weekdays and give you a price in writing. Privacy policy.

Quick Quote (guide pages)