Will a Concrete Truck Get Up My Driveway?
The driveway that suits your car is not the driveway your house gets built from. Concrete, lumber, trusses and a crane all come up the same lane, and they are heavy, wide and tall.
Updated November 2026 · Georgian Bay Siteworks, the site work division of ICFHome.ca
The five things that stop a truck
| Problem | What happens | Fix |
|---|---|---|
| Soft base | The truck sinks, and now you are paying for a tow | 300 mm or more of Granular B under 150 mm of Granular A for a construction lane |
| Weak or shallow culvert | It crushes on the first load | The right pipe at the right depth |
| Too narrow or too tight | Mirrors and bark | Clear the corridor and ease the bends |
| Low branches and wires | The truck stops at the road | Trim before delivery day |
| Too steep | Loaded trucks spin, especially when wet | Regrade, or pump from below |
Base depths from our gravel driveway calculator. Culverts: driveway culvert cost.

Build the lane before the hole
The driveway base goes in early, before excavation, so every truck after that has something to drive on. The finish course waits until the heavy traffic is done. That is the order in raw land to footings.
Half-load season
For several weeks each spring, many local roads are limited to about half the normal axle load. A full concrete truck is not allowed on them, whatever your driveway can carry. Plan pours around it. See half-load season dates.
When a truck simply cannot get there
A concrete pump moves concrete through a boom or a hose from where the truck can park. It adds cost and it has to be booked with the pour. On steep, tight or waterfront lots it is often the only way, so find out before pour day. See building on a steep lot.
Frequently Asked Questions
How much does a concrete truck weigh?
A loaded ready-mix truck weighs well over 20 tonnes.
Will a concrete truck damage my driveway?
On a thin gravel driveway over topsoil, yes. A proper base built for construction traffic carries it.
Can concrete be delivered in spring?
It depends on the road. During half-load season many roads cannot take a full truck.
Related guides
Did Not Find Your Question?
Call 705-533-1633 or send us the address and what you are planning. We answer the phone, and we give prices in writing.
Rather we call you?
Leave your name, number and town. We call back weekdays and give you a price in writing. Privacy policy.